女同久久另类99精品国产_精品国产高清a级毛片_国产一级高清在线观看资讯_暗交小拗女一区二_在线观看无需下载_日本高清无卡码V亚洲_国产亚洲精品综合久久久_今天高清电影免费播放_在线欧美中文亚洲精品_91欧美精品日本在线一区

Skip to main content

Vientiane Laos Mining

Vientiane, Laos

Tensar gabions and geogrids enabled an embankment with two existing tunnels and a crest road to be built quickly, easily and economically at a mine in Laos. 

Benefits

  • 50% savings in construction cost
  • Minimising material imports by using site-won material
  • Fast and simple construction by in-house team with limited geotechnical expertise


Client's Challenge

The mining and metal producer needed to build a reinforced earth embankment incorporating two road tunnels, and a road along its crest, to improve access to one of its existing mines. The 13m high embankment, with 45° slopes, had to be easy to build by the clients team with limited geotechnical engineering experience.

Tensar Solution

Tensar’s design for the embankment incorporated layers of uniaxial geogrid to reinforce the embankment fill, and used geogrid gabions filled with rock fill to form the face of the steep slopes. The result was fast, simple and economical to build and provided long-term stability to the embankment.