女同久久另类99精品国产_精品国产高清a级毛片_国产一级高清在线观看资讯_暗交小拗女一区二_在线观看无需下载_日本高清无卡码V亚洲_国产亚洲精品综合久久久_今天高清电影免费播放_在线欧美中文亚洲精品_91欧美精品日本在线一区

Skip to main content

Lake Stejeris

Cluj County, Romania

Tensar’s TensarTech® Stratum™ Cellular Foundation Mattress System enabled fast and economical construction of a major highway embankment over weak soils. 

Benefits

  • Mitigating differential settlement on weak, saturated ground
  • Minimising material imports to replace weak soils 
  • Saving time and money on construction
Client's Challenge

Romania’s new A10 Highway will run on a 300m long embankment as it crosses over part of Lake Stejeris near the town of Turda. Main contractor PORR needed an economical alternative to excavating and replacing the underlying weak and saturated soils, one that ensured safe construction and long term performance of the road.

Tensar Solution

Tensar’s TensarTech Stratum Cellular Foundation Mattress System created a 1m thick stiff foundation for the embankment. This mitigated differential settlement and lateral spread, as well as increasing the ground’s bearing capacity, enabling construction of the embankment, without the need for costly ground improvement.