女同久久另类99精品国产_精品国产高清a级毛片_国产一级高清在线观看资讯_暗交小拗女一区二_在线观看无需下载_日本高清无卡码V亚洲_国产亚洲精品综合久久久_今天高清电影免费播放_在线欧美中文亚洲精品_91欧美精品日本在线一区

Skip to main content

Eastwood Health Centre

Glasgow, UK

Tensar’s TensarTech GreenSlope system allowed low quality site-won fill to be used in a reinforced soil slope to maximise car parking for a new Glasgow health centre. 

Benefits

  • Enabling the use of site-won fill in a reinforced soil slope
  • Allowing construction during challenging winter weather
  • Maximising development spacewith a soft-engineering finish
Client's Challenge

Morgan Sindall needed to build a 250m long, 3m high reinforced soil slope bounding the car park to Eastwood Health and Care Centre in Glasgow. Low quality cohesive fill, excavated from elsewhere on the site, was to be used to form the slope, which also had to have a natural, vegetated finish.

Tensar Solution

Tensar’s TensarTech GreenSlope reinforced soil system enabled the 70° slope to be built over a very wet winter, which made handling the moisture-sensitive fill particularly challenging. A granular band behind the slope face provided temporary and permanent drainage, enabling all of the fill to be compacted to design requirements.