女同久久另类99精品国产_精品国产高清a级毛片_国产一级高清在线观看资讯_暗交小拗女一区二_在线观看无需下载_日本高清无卡码V亚洲_国产亚洲精品综合久久久_今天高清电影免费播放_在线欧美中文亚洲精品_91欧美精品日本在线一区

Skip to main content

A14 Cambridge to Huntingdon

Cambridgeshire, UK

Tensar’s TensarTech TR2 reinforced soil wall system was the perfect solution for the abutments of three temporary bridges keeping construction traffic flowing smoothly during a major highway project in Cambridgeshire. 

Benefits

  • Robust and economic solution for load-bearing abutments
  • Enabling construction traffic to avoid main roads, reducing disruption to road users and local residents
  • Significant savings in time, labour and costs
Client's Challenge

The Balfour Beatty/Skanska/Costain/Atkins JV building the A14 Cambridge to Huntingdon Improvement Scheme needed robust and economical abutments for three temporary bridges crossing the River Great Ouse and the A14.

Tensar Solution

Tensar’s TensarTech TR2 reinforced soil wall system delivered stable, low-cost retaining walls for theload-bearing bridge abutments, which allowed heavy construction traffic to move easily between sites on either side of the A14, which remained open throughout the project, saving significant time, labour and cost.