女同久久另类99精品国产_精品国产高清a级毛片_国产一级高清在线观看资讯_暗交小拗女一区二_在线观看无需下载_日本高清无卡码V亚洲_国产亚洲精品综合久久久_今天高清电影免费播放_在线欧美中文亚洲精品_91欧美精品日本在线一区

Skip to main content

A24 BroadBridge Heath

Horsham, UK

Tensar’s modular block retaining wall system ensured construction of a new road bridge over the A24 was completed quickly and safely. 

Benefits

  • Robust & cost-effective bridge abutment and retaining wall solution
  • Fast construction minimising the impact on traffic on a busy trunk road
  • Modular system reduced construction risk during temporary works
Client's Challenge

Construction of a relief road linking two major housing schemes near Broadbridge Heath, in West Sussex, included building abridge over the A24. The structure, part of a new junction withthe busy dual carriageway, had to be built quickly, with minimum impact on both the main development works and traffic flow on the trunk road.

Tensar Solution

Tensar’s TensarTech® TW3 retaining wall system was used to build the load bearing bridge abutments and wing walls for the new bridge. The geogrid-reinforced soil structures with mechanically connected concrete block facing, support the 28m span bridge deck. The modular system was fast and easy to install, reducing the number of crane lifts and keeping A24 lane closures to a minimum.